Huawei Certified Network Professional - WCDMA Certification Exam

Prerequisites

No prerequisites.

Exam Content Overview

WCDMA exam covering the basic principles of the WCDMA and GPRS systems, product architecture and specifications, typical hardware configuration, engineering survey and hardware installation, software commissioning and testing, acceptance testing, maintenance and troubleshooting. Based on the HCNA examination, HCNP examination add the containts below: basic signaling process of the WCDMA system, the M2000 and CME-related product knowledge, data configuration, software commissioning of site controler, site software upgrades.

Exam results valid period

This exam result is valid for 3 years.

Re-certification Methods

Before your certification expires, you should re-certify with the following methods:

Certificate Re-certification Methods
Huawei Certified Network Professional - WCDMA To re-certify, pass ONE of the following before the certification expiration date:
  • Pass any subject of the same level of certification in the field of the local technology
  • Pass any subject of the high-level certification in the field of the local technology

Key Points of Exam

Principles
  • WCDMA system architecture ,The basic principle of WCDMA and the wireless network interface
  • The signaling process of the WCDMA system
Product knowledge
  • BSC6900 (WCDMA) system introduction, hardware architecture and product specifications
  • Typical configuration of BTS3900/DBS3900 (WCDMA),BTS3900/DBS3900 (WCDMA) hardware architecture and module functions
  • Typical configuration of BTS3900/DBS3900 (MBTS), hardware architecture and module functions
  • CME configuration tool principles and operational guidance
  • The M2000 system architecture and operating instructions
Engineering survey and hardware installation
  • Installation design and Engineering survey (product knowledge)
  • Hardware Installation
Software Conmmissioning
  • Remote/Local commissioning of the site
  • Site service testing and site integration
  • Testing indicators and testing tool
  • Data configuration(site controller and site)
  • Software commissioning of the controller
  • New site integration through M2000
Acceptance testing
  • Acceptance of a single-site and hardware installation check
  • Acceptance process of controller
Software Upgrade
  • Remote upgrade of the site
  • Local upgrade of the site
Maintenance and troubleshooting
  • Hardware Replacement
  • Information collection for controller
  • Deal with problems on site for controller
  • On-site emergency recovery for controller