Huawei Certified Network Associate - CDMA Certification Exam

Prerequisites

No prerequisites.

Exam Content Overview

CDMA sub-contractors examination involved:  cdma2000 1X & 1xEV-DO technology base of knowledge, the technical characteristics and network structure of Trustar digital trunking communication system, the transmission basic priciple and related products  hardware basic knowledge , hardware installation skill, basic maintenance knowledge.

Exam results valid period

This exam result is valid for 3 years.

Re-certification Methods

Before your certification expires, you should re-certify with the following methods:

Certificate Re-certification Methods
Huawei Certified Network Associate - CDMA To re-certify, pass ONE of the following before the certification expiration date:
  • Pass any subject of the same level of certification in the field of the local technology
  • Pass any subject of the high-level certification in the field of the local technology

Key Points of Exam

Principles
  • cdma2000 1X & 1xEV-DO basic technology (CDMA technology development road signpost、f cdma2000 1X/1xEV-DO technical characteristics and network structure, key technology of cdma2000 1X and UM channel Introduction、EVDO new technologies and UM channel Introduction) ;
  • The technical characteristics and network architecture of the the Trustar digital trunking communication system
Product knowledge
  • BSC6680/BSC6600 / RAC6610/MSE9830 controller and bts products(hardware components, the basic configuration rules and board function.);
  • The meaning of the BSC6680/BSC6600 / RAC6610/MSE9830 controller and bts products, the meaning of it’s board indicator light;
  • BTS3900/BTS36xx series of CDMA base station antenna and feeder cable introduction (basic knowledge of radio waves, the basic principles of antenna radiation of electromagnetic waves, introduced the concept of the antenna transmission cable, the base station antenna and feeder cable systems) ;
  • The introduction of complementary products (room environment of the project site, the power system , alarm boxes, etc.) ;
  • The controller and bts products survey content and survey Note;
  • The bts hardware distribution, delivery rules, methods, understanding Huawei BOQ and the meaning of the packing list;
Data configuration and commissioning
Acceptance Test
  • The BTS hardware installation quality inspection content and standards;
  • Grasp the power meter, sitemaster ,test terminal use method
Chinese Edition adds the following
  • The BSC hardware installation quality inspection content and standards
Maintenance and Troubleshooting
  • Grasp the replacement method and operation procedure of BSC6680/BSC6600/RAC6610/MSE9830 board、frame etc.
  • Grasp the replacement method and operation procedure of BTS36xx/39xx serial bts board、BBU etc.